Heerema PROJECTS

Stories about our projects

Every day we help our clients make the impossible possible. You can read about some of these projects here. 

Aegir Changhua JdN high res (2)
Aegir Changhua JdN high res (2)
Offshore wind

Changhua

The installation of the 84 piles and 21 jackets for the Changhua Offshore Windfarm Phase 1.

Read more
Sable Island Exxonmobil Heerema Thialf removal recycling decommissioning
Sable Island Exxonmobil Heerema Thialf removal recycling decommissioning
Offshore decommissioning

Sable Project

48,000 metric tons of infrastructure removed with zero recordable HSE cases.

Read more
Sleipnir installing Leviathan platform (1) Low Res
Sleipnir installing Leviathan platform (1) Low Res
Offshore transport and installation

Leviathan

Installing the Leviathan platform, with Sleipnir's first project being the record-breaking 15,300 topside installation. 

Read more
Scherm AerolinPhoto-0725
Scherm AerolinPhoto-0725
Heerema Fabrication

Golden Eagle

Fabricating two 6,500 metric ton jackets at the Heerema Fabrication Group yard in Vlissingen in only eighteen months

Read more