Providing a cost-effective and robust installation strategy

offshore wind constructability study
offshore wind constructability study
Early Phase Wind Development

Constructability Study

Our client needed a realistic and cost-effective installation strategy to bid on two sites in the Northern Europe area.

 

At a glance

Challenge

Our client needed a realistic and cost-effective installation strategy to bid on two sites in the Northern Europe area.

Actions

We performed a constructability study for monopiles, pre-piled jackets, inter-array cables, and wind turbine generators that considered environmental conditions, soil conditions, and regulations.

Benefits

By using our in-house logistical simulation tool, Metis, we could quickly run, add, and change scenarios due to its parametric setup.

Solution

We developed a set of robust and cost-effective offshore construction scenarios and identified that the monopile size chosen would cause difficulties.

 

 

The HES Approach

waldemar-s-3EZB0EsXI-unsplash
Enable

We enable clients to have a clear, reliable, and data-driven understanding of the associated timeframe and costs for their offshore wind farm development.

ben-kim-9-jubOe3c6c-unsplash
Improve

We improve project duration, cost, and weather downtime by applying our specialist knowledge and services to develop robust and cost-effective construction strategies for our clients.

nicholas-doherty-pONBhDyOFoM-unsplash
De-risk

We de-risk projects by further defining installation processes, optimizing critical operations, and providing clear insights on construction risks that could impact on duration or cost.

ant-rozetsky-q-DJ9XhKkhA-unsplash
Early Phase Wind Development

We advise clients in the early development phase of offshore renewable projects. Our extensive knowledge in the industry enables our clients to develop their projects sustainably and profitably, identifying risks in an early stage.

Read more

Logistical Analysis

By using our in-house developed logistical simulation tool Metis, we can provide insights into construction duration and critical operations. This analysis enables our clients to reduce project duration, costs, and weather downtime by developing robust and risk-averse strategies and methodologies.