Metis
Solve Any Offshore Logistics Problem
Metis revolutionizes offshore wind installation logistics by combining advanced simulations with our vast offshore experience.
Cut costs, streamline operations, and eliminate risks before they happen.
-5.jpg?width=720&name=DOB-DOT-FOX%20(1%20of%201)-5.jpg)
Enable your project
In the complex world of offshore wind installation, strategic planning and precise execution are the keys to success. We have used Metis to perform constructability analyses for clients and these planning simulations have enabled and enhanced the development of risk-averse and cost-effective offshore wind farm installation strategies that can be used for bids and planning.

Improve and optimise
Unexpected delays during the installation of offshore wind farms can result in financial and operational issues. By improving and optimising offshore wind installation strategies, Metis can determine whether relationships between simultaneously occurring operations will hinder and delay or be smooth sailing.

De-risk installation
We think about weather, visibility, available yards and their capacity, number of required transportation assets, start of intermediate transport, monohull vs. SSCV installation vessels, feeder or shuttle solutions, Jones Act compliant vessel availability, and associated costs, amongst more depending on the project specifications.
Metis Facts & Figures
90%
Offshore experienced engineers
71
Projects succesfully executed
15
Different end-clients
4.8/5
External client rating
Metis in a nutshell
Why use Metis?
- Gain insight into the project execution durations, costs, and risk to prepare a reliable offshore wind bid or installation strategy.
-
Optimise your offshore wind project execution strategy, for risk, cost and duration.
-
Understand how unexpected events could impact your offshore wind construction strategy to mitigate at an early stage.
- Fully customisable to what your projects needs.
Key features
-
Simulate multiple assets with parallel and interdependent activities, to determine any risks or showstoppers.
-
Assess the effect of simple or dynamic weather limits on the offshore workability, to assess whether weather limitations will effect project duration.
-
Simulate many options to find the best T&I approach.
-
Find bottlenecks and solutions through sensitivity analysis.
-
Quantify costs and emissions throughout the project to develop a robust offshore wind installation strategy.

Metis services

Metis reports
Traditional consultancy
- Complete logistical analysis performed by HES
- Based on extensive experience
- Strict quality control
- Complete report

Metis Dashboards
Dynamic solutions
- Pre-programmed logic
- Easy-to-use
- Run simulations
- Fully customizable

Metis API
Calculate your own solutions
- Full flexibility
- Entry level python programming
- Custom post processing
- HES programming support
Find out what impacts your project
The interactive plot on the right is an example of the output we produce to find out how decisions can impact your offshore wind project.
This example shows that starting in the right season has a significant impact on the expected weather down time.
But not only the expected weather downtime is important. Aspects such as daylight restrictions, whale encounters, and breakdowns can be just as important. Metis has been purposely designed to include such aspects.
Tailored to your needs
One key feature of Metis is the framework's customisability. Each client has diverse needs, and each project has differing variables that could affect its success.
We help clients gain insights into the project execution durations, costs, and associated risks. By analysing these insights, HES optimizes the project execution strategy for cost, risk, and duration which reduces CAPEX and OPEX for clients, while ensuring regulators are satisfied with robust and well-planned projects that can be delivered in a timely manner.
The Metis report service offers consultancy that demonstrates what scenario will minimise costs, as well as which scenario will result in the most robust and low-risk plan to ensure timely completion of the project.

Featured knowledge
Go to knowledge center.jpg?width=1200&name=grahame-jenkins-U16ligRKQB0-unsplash%20(1).jpg)
Let’s talk about your challenge
Get in touch with us to take the first steps towards a robust and cost-effective offshore wind installation strategy.