Jacket Reinforcement for Removal

HES was involved in the jacket removal of the Brent Alpha platform.

See our response
jacket_reinforcement_full
jacket_reinforcement_full5
jacket_reinforcement_full6
jacket_reinforcement_full3
jacket_reinforcement_full jacket_reinforcement_full5 jacket_reinforcement_full6 jacket_reinforcement_full3

Structural Engineering

HES was involved in the jacket removal of the Brent Alpha platform. The scope consisted of the design of temporary platform to accommodate removal equipment, the design of a roof to protect against falling objects, lifting analyses and the design of a jacket reinforcement system to safeguard the structural integrity of the split jacket during lifting.

The involved engineer was invited to go offshore during the execution on board of the Sleipnir.