

Heerema Engineering Solutions
Jacket Reinforcement for Removal
HES was involved in the jacket removal of the Brent Alpha platform.
Structural Engineering
HES was involved in the jacket removal of the Brent Alpha platform. The scope consisted of the design of temporary platform to accommodate removal equipment, the design of a roof to protect against falling objects, lifting analyses and the design of a jacket reinforcement system to safeguard the structural integrity of the split jacket during lifting.
The involved engineer was invited to go offshore during the execution on board of the Sleipnir.

Modifying Thialf's 14,200 metric ton cranes
Heerema Marine Contractors is committed to delivering solutions for our clients worldwide, which means sometimes we must think creatively to get there! With Heerema Fabrication Group fabricating the required structures, we are now modifying Thialf's cranes capable of lifting 14,200 metric tons.